![AME POWERLIFT 600MOB User Manual Download Page 37](http://html1.mh-extra.com/html/ame-0/powerlift-600mob/powerlift-600mob_user-manual_2921841037.webp)
10 MAINTENANCE
Electric Portable Patient Lift
38
10.7 Replacing the Swivel Bar
1.
The swivel bar comes attached to the boom with bolt, nut, washers, and pinch guard.
2.
Remove existing hardware and replace the swivel bar.
WARNING
After the first year of use, the hooks of the swivel bar and mounting brackets of the boom should be inspected every six months to
determine the extent of wear. If these parts become worn, replacement must be made.
Washers should be placed against both sides of the boom mounting bracket to eliminate damage.
The swivel bar has three hooks on both ends to attach the sling that supports the patient during lift.
CAUTION
DO NOT overtighten the nut and bolt. This damages the mounting bracket.
600 lbs Swivel Bar
450 lbs Swivel Bar