Ambirad Vision VSX Servicing & Commissioning Manual Download Page 9

 

Step 5  The turbulators should be cleaned with 
a soft brush. 

Step 3 If required the interior of the tubes can 
then be cleaned using an industrial vacuum 
cleaner or by using long poles and a scraper. 
 
Step 4 Refit components. 
 
 

3.8 Heat exchanger Servicing 
 

Step 1  Remove the flue connections 

 
Step 2 Slacken casing support screws and  
remove heat exchanger from the radiant tube. 

Step 3  Remove any dust and dirt from the 
heat exchanger & refit. 

3.9 Reflector Servicing 
 

The condition of the reflectors should be noted. 
If necessary the reflectors can be cleaned with a 
mild detergent. This can significantly improve 
the efficiency of the  appliance. 
 
 

3.10 Sweeping of Flue 
 

Inspect the fresh air inlet duct and vent to      
ensure they are free from any blockage or     
obstruction. The air inlet terminal and vent 

 

 

 

 

terminal should be inspected to ensure they are 
not liable to obstruction. 
 
 

3.11 Recommissioning After Service 
 

After  servicing  of  the  heater  has  been            
undertaken, 

it 

will 

be 

necessary 

to                   

re-commission the heater as detailed in Section 
3 of these instructions. 

Summary of Contents for Vision VSX

Page 1: ...ith the relevant provisions of the Gas Safety Installations and Use Regulations 1998 for gas fired products Due account should also be taken of any obligations arising from the Health and Safety at Wo...

Page 2: ...t tube heaters specified in these instructions due care 3 9 Reflector Servicing 3 10 Inspection of Flue 3 11 Re commissioning after Service 4 Spare Parts 5 Fault Finding Guide 6 Replacing Parts 6 1 Bu...

Page 3: ...2 8 2 4 450x5927x746 158 0 5 2560 VSX45UT 44 0 39 6 4 2 11 6 2 9 450x5927x746 158 0 5 2560 VSX50UT 49 5 44 6 4 7 12 8 2 5L 450x7692x746 205 0 5 2560 1 3 Table 1 Technical Details All heaters to run on...

Page 4: ...nd inspect burner head See servicing instructions Check operation of air pressure switch Leave the instructions with a responsible person Injector pressure test point Adjustment screw under cap to set...

Page 5: ...Wrench with 13mm Socket 12mm Spanner 3 1 Tools Required The following tools and equipment are advisable to complete the tasks laid out in this manual Suitable alternative tools may be used Large Adjus...

Page 6: ...nger and remove the flexible hose from the burner Step 6 Slacken the set screw on the burner support casting to enable the burner to be removed from the radiant tube Step 7 Remove the burner and posit...

Page 7: ...replaced ensuring the 5 holes on the outer ring are aligned alongside the probes Step 3 The condition of the igniter assembly can be checked for deterioration However we advise replacement at each ser...

Page 8: ...dust with a soft brush Step 6 Remove any dust from fan scroll and from around the motor Step 7 Ensure the impeller rotates freely Step 8 Refit components 3 7 Radiant Tube Servicing Step 1 Brush any d...

Page 9: ...hanger refit 3 9 Reflector Servicing The condition of the reflectors should be noted If necessary the reflectors can be cleaned with a mild detergent This can significantly improve the efficiency of t...

Page 10: ...ription See section 1 10 Injector 200358 Extruded Burner Head Item 201284 Ignitor Assembly Part No Description 200988 Pepperpot Head Item 2175 Amber Neon Burner On 2180 Red Neon Mains On 200420 Jet Ca...

Page 11: ...cuum switch pull in Check 1 Wiring harness plugs 2 Vacuum switch operation 3 Replace fan Is the burner sparking Does the gas valve open Check 1 Burner controller 2 Replace gas valve Check 1 Vacuum swi...

Page 12: ...tep 5 Fit new burner controller Step 6 Refit HT leads and refit burner controller to wiring harness Step 7 Test product and close access doors 6 2 Air Pressure Switch Replacement Step 1 Disconnect the...

Page 13: ...impulse tube and the burner head wiring Step 5 From within the combustion chamber remove the two screws holding the front of the gas valve Step 6 Turning the housing over remove the four screws holdin...

Page 14: ...and a mild detergent non solvent based cleaners only in water can be undertaken Additional removal of dust from the radiant tubes burner and heat exchanger can be undertaken 7 4 Frequency of Servicin...

Reviews: