![Ambirad AMBIRAD VISION VSX Series Installation And Operating Manual Download Page 15](http://html1.mh-extra.com/html/ambirad/ambirad-vision-vsx-series/ambirad-vision-vsx-series_installation-and-operating-manual_2920687015.webp)
Doc No. 700015 Page 15 of 36
Suitable alternative tools may be used.
2. Assembly
Instructions.
PLEASE READ
this section prior to
assembly to familiarise yourself with the
components and tools you require at the
various stages of assembly. Carefully open the
packaging and check the contents against the
parts and check list.
The manufacturer reserves the right to alter
specifications without prior notice.
Please ensure that all packaging is
disposed of in a safe environmentally
friendly way.
For your own safety we recommend the
use of safety boots and leather faced
gloves when handling sharp or heavy items. The
use
of
protective
eye
wear
is
also
recommended.
2.1 Tools
Required.
The following tools and equipment are advisable
to complete the tasks laid out in this manual.
Pozidrive
Screwdriver
Trestles
Leather
Faced
Gloves
Tape
Measure
Spanner
Set
4 & 5mm
Allen keys
2.2.4 Reflectors.
All reflectors AND canopies must be
positioned/attached to the brackets exactly
as detailed in the assembly drawings.
Remove the protective plastic coating.
2.2.5 Couplers.
Locate and position tube couplers at the end of
the tubes. Ensure socket heads are facing
outwards & the pre-fitted bolts in the couplers
line up with the locating holes in the tubes.
Ensuring the bolts are not over tightened.
2.2 Assembly
Notes.
2.2.1 Turbulators
Ensure the correct length and quantity are
inserted into their respective correctly
identified tube(s) as detailed in the assembly
drawings.
2.2.2 Brackets
Tighten clamping ‘U’ bolt arrangement to
tubes
ONLY WHERE STATED
on the
assembly drawings.
Please read
these assembly notes in
conjunction with the correct assembly
drawings (figs 7 to 10).