
20
On receipt of the machine
DB 534 02. 02
4.2
PTO shaft drive
The reduction gear (i = 1:2) for the spreading disc
and the agitator is driven via the PTO shaft. With this
gearbox the spreading disc rev. speed is approx. 270
min
-1
at a PTO shaft rev. speed of 540 min
-1
.
4.3
Fitting the PTO shaft
a
Danger of tipping over.
Assemble centrifugal broadcasters only
with empty hopper.
I
Only use the PTO shaft prescribed by
the manufacturer. Walterscheid-PTO
shaft (W100E-SD05-710).
I
Observe the instruction manual of the
PTO shaft manufacturer.
Remove the PTO shaft guard on the implement side
PTO shaft half:
-
Tilt machine to the rear.
-
Remove fixing bolt (1) n.
ZA 013a
-
Twist cone (1) into fitting position (2).
ZA 014a
1
1
2
Summary of Contents for E+S
Page 39: ...Setting charts 39 DB 534 02 02 9 2 Thawing salt...
Page 40: ...40 Setting charts DB 534 02 02 9 3 Moraine grit...
Page 41: ...Setting charts 41 DB 534 02 02 9 4 Slag...
Page 42: ...42 DB 534 02 02...
Page 43: ...43 DB 534 02 02...