Vipros 357 Queen with Fanuc 18PC User Pre-installation Guide
©Amada America, Inc.
Print Date 01/24/2001 Revision 4.0
This document available on the World Wide Web at http://www.amada.com
Page 5 of 37
Introduction
This manual describes the tasks that the purchaser of a Vipros 357 Queen must complete before calling A.E.S.I. (Amada
Engineering and Service Incorporated) to complete the installation and operator training.
An overview of the preparations is as follows:
!
Plan the location of the Vipros 357 Queen taking into account the Recomended Safety and Maintenance areas indicated
on the plan view. See page 13,
Planning the Location of the Vipros 357 Queen.
!
Prepare the Vipros 357 Queen floor or foundation as required. See page 21,
Foundation Requirements
, for details.
!
Uncrate the Vipros 357 Queen and place on the foundation, but do not fill the anchor-bolt holes (if used) until after A.E.S.I.
completes the initial installation.
!
Install the electrical supply. See page 10,
Supply Requirements - Electrical
, for details.
!
Install the pneumatic supply. See page 12,
Supply Requirements - Pneumatic
, for details.
!
Remove the protective coating from the surface of the Vipros 357 Queen See page 31
, Removing the Protective Coating
,
for details.
!
If additional equipment is to be installed, repeat the previous steps for each piece of additional equipment.
Note:
It is the purchaser’s responsibility to install any safety devices to ensure the recommended safety area.
Note:
Considerable effort has been made to ensue that this manual is free of inaccuracies and omissions. However, as
Amada America strives to continually improve our products, some data contained herein may not exactly reflect the
latest revisions to the Vipros 357 Queen. If in doubt concerning a specific item, please contact your local Amada
America sales engineer for clarification.