4 Assembly Steps – Motor and ESC
1.) Prepare your motors.
2.) For the new motors, Thread Lock
must be applied to the two M3 Set
Screws which is pre-installed.
3.) Install the Porp Mount to the motor
using 3pcs M3x8mm Hex Cap Screw.
4.) Solder two pair
Power/ESC Board
Power Cable to your Battery Connectors.
5.) Solder the other Ends to the
Power/ ESC Board which is
pre-
installed inside the Main Frame
Body.
6.) Parallel two ESCs.
7.) Solder Black and Red AWG wires
to 2pcs of ESCs in Parallel. Same for
other 3 pairs of ESCs.
8.) Solder 4 pairs AWG wires to the
POWER/ ESC Board inside the
Main Frame Body of Cyclone X8.
7
Summary of Contents for Cyclone X8
Page 1: ...Cyclone X8 Octocopter Instruction Manual v1 0 28 Jan 2014 1 ...
Page 8: ...5 0 Assembly Steps Arm Set 8 ...
Page 9: ...9 ...
Page 10: ...5 1 Assembly Steps Body and Retract System Landing Skid Φ16 PVC Cover 10 ...
Page 11: ...5 2 Assembly Steps Final Assembly 11 ...
Page 12: ...12 ...
Page 13: ...13 ...
Page 14: ...Fixing the Arm Boom 14 ...
Page 15: ...15 ...