INSTALLATION AND OPERATION MANUAL | CUL11 CONTROL UNIT
8
8
OPERATION TEST AND COMMISSIONING
J4
N
LL
LAMP
230V
max100W
J5
J3
W
V
U
PE PE
M
3~
YE-GN
IN
OUT
+24V
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
V1
V2
+24V
KEY4
LED+
+24V
+24V
KEY2
+24V
KEY3
KEY1
LED-
NO
NO
RD
BU
J10
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
-
PNP NC
BN
BK
BU
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
NC
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
NC
PNP
NPN
J9
NO
NC
J13
A
B
C
J4
N
LL
LAMP
230V
max100W
J5
J3
W
V
U
PE PE
M
3~
YE-GN
IN
OUT
+24V
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
V1
V2
+24V
KEY4
LED+
+24V
+24V
KEY2
+24V
KEY3
KEY1
LED-
NO
NO
RD
BU
J10
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
-
PNP NC
BN
BK
BU
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
NC
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
NC
PNP
NPN
J9
NO
NC
J13
A
B
C
Figure 4
. Lamp connection
Figure 5
. Electric motor connection
J4
N
LL
LAMP
230V
max100W
J5
J3
W
V
U
PE PE
M
3~
YE-GN
IN
OUT
+24V
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
V1
V2
+24V
KEY4
LED+
+24V
+24V
KEY2
+24V
KEY3
KEY1
LED-
NO
NO
RD
BU
J10
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
-
PNP NC
BN
BK
BU
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
NC
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
NC
PNP
NPN
J9
NO
NC
J13
A
B
C
J4
N
LL
LAMP
230V
max100W
J5
J3
W
V
U
PE PE
M
3~
YE-GN
IN
OUT
+24V
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
V1
V2
+24V
KEY4
LED+
+24V
+24V
KEY2
+24V
KEY3
KEY1
LED-
NO
NO
RD
BU
J10
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
-
PNP NC
BN
BK
BU
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
NC
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
NC
PNP
NPN
J9
NO
NC
J13
A
B
C
Figure 6
. Valves connection
Figure 7
. Connection of control
buttons and
LED
(
fig
. 1)
J4
N
LL
LAMP
230V
max100W
J5
J3
W
V
U
PE PE
M
3~
YE-GN
IN
OUT
+24V
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
V1
V2
+24V
KEY4
LED+
+24V
+24V
KEY2
+24V
KEY3
KEY1
LED-
NO
NO
RD
BU
J10
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
-
PNP NC
BN
BK
BU
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
J8
NC
PNP
NPN
J9
NO
NC
J13
VAL2
VAL1
+24
GND
GND
GND
VAL3
DAT
NC
PNP
NPN
J9
NO
NC
J13
A
B
C
Figure 8
. Connection of the door position sensor:
A — optical sensor, B and C — mechanical sensor
Y
ATTENTION!
Examples of connection of the door position sensor located at the door opening
are given in
fig.
8. The dock leveller is operational (operation is not blocked), when there is
no door leaf in the sensor coverage. The door position sensor should be selected and properly
connected depending on sensor type and its installation place (mode of application).
5.
OPERATION TEST AND COMMISSIONING
Y
ATTENTION!
The initial commissioning should be performed by qualified and trained
personnel to ensure correct operation of the loading equipment. The dock leveller should be
suitable for automation. When installation and electric connection are completed, check that
operations are performed correctly and equipment is ready for operation.
Summary of Contents for CUL11
Page 1: ...CONNECTION AND OPERATIONAL MANUAL Control unit CUL11 English 2020 www alutech group com ...
Page 2: ......
Page 4: ......
Page 17: ...INSTALLATION AND OPERATION MANUAL CUL11 CONTROL UNIT 15 15 SPECIAL NOTES ...
Page 18: ......
Page 19: ......