eFlow104N Series Installation Guide
- 9 -
Battery & AC
Supervision Circuit
(power-limited)
power-limited
Battery Connection
non power-limited
P N
PD8UL/PD8ULCB
P N
PD8UL/PD8ULCB
DC Output to Devices*
(refer to Fig. 3a, 3b, 4a, 4b
for board configuration, pg. 6)
DC Output to Devices*
(refer to Fig. 3a, 3b, 4a, 4b
for board configuration, pg. 6)
– DC
+
– BAT
+
L G N
120VAC power mains
non power-limited
Green
Lead
CAUTION: Power supply board is factory set for 24VDC. Use two (2) 12VDC stand-by batteries.
Keep power-limited wiring separate from non power-limited. Use minimum 0.25" spacing.
12AH Rechargeable batteries are the largest batteries that can fit in this enclosure.
A UL listed external battery enclosure must be used if using 40AH or 65AH batteries.
Optional Rechargeable Stand-by
Battery for UL294 Applications.
Note: 12V batteries are required for UL603,
UL1481 and Canadian installations.
Optional Rechargeable Stand-by
Battery for UL294 Applications.
Note: 12V batteries are required for UL603,
UL1481 and Canadian installations.
Fig. 7 -
eFlow104NX Configuration
Tamper Switch
(included)
To Access Control Panel or
UL Listed Reporting Device
Edge of
Enclosure
Enclosure
* Outputs are non power-limited:
eFlow104NX, eFlow104NX8, eFlow104NX16.
Outputs are Class 2 power-limited:
eFlow104NX8D, eFlow104NX16D.