
27
MOSTOSTAL Plus FRAME SCAFFOLDINGS Assembly Manual
* closed facade, when number of openings is less than 20% of
facade surface
Type of facade filling
Closed facade
Vertical anchoring spacing
8 m
Horizontal anchoring spacing
every second bay
Maximum force in the anchor
(kN)
||
2,8
4,1
Maximum force in the foot
(kN)
Internal
stand
24,3
17
External
stand
44,4
Scaffolding without covering, closed facade*
Working platform load of 2 kN/m²
Safety platform 1 kN/m²
Option: bracket 0,36 m – inside, all levels
horizontal brace
* closed facade, when number of openings is less than 20% of
facade surface
Type of facade filling
Closed facade
Vertical anchoring spacing
8 m
Horizontal anchoring spacing
every second bay
Maximum force in the anchor
(kN)
||
2,6
4,2
Maximum force in the foot
(kN)
Internal
stand
21,3
19
External
stand
32,0
Scaffolding without covering, closed facade*
Passage frame option
Working platform load of 2 kN/m²
Safety platform 1 kN/m²
Vertical brace on two levels, 2 for every 5 bays
horizontal brace
– anchor fastening two stands
– anchor fastening one stand
– double V-anchor
– single anchor
– vertical brace
– protective railings
– horizontal brace
–
double V-anchor, one for 5 bays – horizontally
– anchor fastening two stands
– anchor fastening one stand
– double V-anchor
– single anchor
– vertical brace
– vertical brace from the wall
– protective railings
– horizontal brace
–
double V-anchor, one for 5 bays – horizontally
3 ASSEMBLY OF SCAFFOLDINGS UP TO 34 m HIGH