30
10
Take the vent frame that is ready
assembled and fix the vent hinge to one
end through the 4 pre drilled holes
using the 19mm screws, diagram 69
and 70. Once this is in place fix the
plastic vent filler (EV0323) also with a
19mm screw, its is
important
to make a
pilot hole before fixing the plastic filler
to prevent splitting.
Now take a 610mm x 469mm pane of
glass and locate this in the vent hinge.
Before lowering this down completely
slot the glass stops onto the open edge.
EV03
15M
EV0323
EV1106M
(Cedar capping part number: EV1110)
Diagram 70
When in position you can fix the glass in
place with the vent capping (either cedar
or aluminium) using the 25mm screws,
diagram 71. Remember if you are using the
aluminium capping system you will need
to insert the rubber seal before fixing it in
place.
Diagram 71
External
External
610
X
469
EV0313M
Rubber seal
610
X
469
Diagram 69
Dia. 70
Dia. 71
Roof Vent Installation
Summary of Contents for Evolution octagonal
Page 1: ...1 04 19...