Post-Installation Checklist
36
MN-29805 • Rev 11 • 07/18 • Combitherm CT Express Installation Manual
Electrical
What is the rated voltage and phase of the appliance(s) installed?
VOLTAGE
PHASE
Is the wire size for the main incoming power to the appliance(s) in
accordance with the minimum size listed in the specifi cation sheet
for this specifi c appliance?
PASS
FAIL
What is the measured voltage at site?
L1-N
L2-N
L3-N
L1-L2
L2-3
L1-L3
PASS
FAIL
What is the current draw of the appliance(s) to be supplied?
AMP
RATING
What is the on-site breaker size supplying power to the
appliance(s)?
SIZE
PASS
FAIL
Is there a disconnect or junction box within 3' (914mm) of where
the appliance(s) will be installed?
PASS
FAIL
Comments:
Drain
What type of material was used for the drain?
Does the vertical drain vent extend above the appliance exhaust
opening at the rear of the appliance?
PASS
FAIL
Is there a vertical vent within 12" (305mm) of the appliance drain?
PASS
FAIL
Is there an air gap installed at the end of the drain run?
PASS
FAIL
SIZE
Is the drain piped with a positive descending slope?
PASS
FAIL
If the appliance has a ventless hood (appliance model name
ending in “EVH”), has the ventless hood drain been plumbed along
with the appliance main drain.
PASS
FAIL
Comments:
Other Site Information
Is there a proper ventilation hood installed above the location of
the appliance(s)?
PASS
FAIL
Is the appliance level according to leveling instructions in the
installation manual?
PASS
FAIL
Comments:
Post-Installation Checklist
Summary of Contents for CT Express Combitherm CTX4-10E
Page 14: ...This page intentionally left blank...
Page 52: ...CT Express...