
MN-37234 (Rev. 3) 06/16 • Hot Food Holding Drop-In Well • 21
SERVICE SUPPLEMENT
4/1/16
1
AFFECTED MODELS TO INCLUDE:
100-HW
PURPOSE:
INSTRUCTIONS FOR MOUNTING A 100-HW HOTWELL UNDER A COUNTERTOP
NOTE:
KIT ASSEMBLY # 5020793
TOOLS NEEDED:
PLATE TO MIX EPOXY ON, STICK TO MIX WITH, TAPE, MARKER, SCISSORS, 7/16”
WRENCH, PLIERS
SRV-20035 REV. 1
Alto-Shaam Technical Service 800-558-8744 x6702
1 of 7
KIT 5020793
REV.
ECO
DESCRIPTION
DATE
APP
0
7530
NEW RELEASE
JRK
1
7530
ADDED UNDERMOUNT HARNESS
3/17/2016
JJH
SRV-20035 REV. 1
Alto-Shaam Technical Service 800-558-8744 x6702
q
MIX J-B WELD STEEL AND HARDENER AT 1:1 RATIO (2 OZ WILL BE ENOUGH FOR
FOUR STUDS).
2 of 7
1
2
3
4
BEFORE MIXING
AFTER MIXING
q
SPREAD MIXED EPOXY ON TOP OF BASE PLATE OF STUD. THE EPOXY SHOULD BE
APPROXIMATELY SAME THICKNESS AS THE BASE PLATE.
NOTE:
SCREWING THE WING NUT ALL THE WAY ON AND THEN BACK OFF IS A
GOOD WAY TO CLEAR ANY EPOXY ON THREADS BEFORE IT DRIES.
COVER THREADS WITH
TAPE TO AVOID GETTING
EPOXY ON THEM
q
CLEAN THE BOTTOM SURFACE OF THE COUNTER THAT THE HOT WELL WILL MOUNT
TO (INSIDE CUTOUT SURFACE OF COUNTER MUST BE FINISHED/SEALED FOR
SANITATION PURPOSES. A SOLID SURFACE OR METAL COUNTER IS SUGGESTED).
NOTE:
CUTOUT DIMENSIONS ARE SHOWN IN THE IMAGE BUT ARE NOT INCLUDED IN
THESE INSTRUCTIONS. 6” [153mm] MINIMUM CLEARANCE FROM EACH SIDE OF THE
CUTOUT IS REQUIRED FOR UNDERMOUNT INSTALLATION.
q
USE A PAPER GAUGE (KIT INCLUDES PAPER TEMPLATES - USE SCISSORS TO CUT
THE IMAGES OUT AND FOLD ON DASHED LINES). MARK STUD LOCATION CIRCLES AT
THE CENTER OF EACH OF THE FOUR SIDES OF THE CUTOUT ON THE BOTTOM SIDE
OF THE COUNTER.
NOTE:
IF POSSIBLE, ROTATE COUNTER TO BOTTOM SIDE UP FOR EASIER
INSTALLATION, BUT INSTRUCTIONS ARE INCLUDED IF YOU ARE NOT ABLE TO DO SO.
STUD LOCATION CIRCLE
SRV-20035 REV. 1
Alto-Shaam Technical Service 800-558-8744 x6702
3 of 7
5
6
7
8
q
PRESS STUD ONTO BOTTOM OF COUNTER UNTIL THE EPOXY SEEPS THROUGH
THE HOLES ON THE STUD BASE PLATE.
q
SPREAD EPOXY EVENLY OVER BASE PLATE TO COMPLETELY COVER IT. KEEP
THE EPOXY WITHIN THE DRAWN CIRCLES IN THE COUNTER REFERENCED IN
STEP 2.
q
APPLY TAPE TO HOLD THE STUD IN PLACE IF COUNTER IS BOTTOM SIDE DOWN.
ALSO WRAP TAPE AROUND THE THREADS OF THE STUDS TO PREVENT DRIPS
ONTO THE THREADS.
NOTE:
A DROP CLOTH BELOW ALL THE STUDS IS RECOMMENDED TO CATCH ANY
EPOXY DRIPS.
q
ALLOW EPOXY TO DRY OVERNIGHT (APPROXIMATELY 15 HOURS).
SRV-20035 REV. 1
Alto-Shaam Technical Service 800-558-8744 x6702
4 of 7
9
10
11
12
q
PLACE A BRACKET AND NUT ON EACH STUD AND TIGHTEN EACH UNTIL IT BEGINS
TO GRAB THE BOTTOM OF THE HOT WELL FLANGE. IF THE COUNTER IS BOTTOM
SIDE DOWN, TIGHTEN OPPOSITE SIDES FIRST TO HOLD THE WELL IN PLACE
WHILE YOU TIGHTEN THE REMAINING TWO STUDS.
q
APPLY A LINE OF FOOD GRADE SILICONE ALONG THE TOP FACE OF THE HOT
WELL FLANGE AND PLACE THE HOT WELL CENTERED ON THE CUTOUT.
NOTE:
IF COUNTER IS BOTTOM SIDE DOWN AND YOU HAVE NOTHING TO HOLD IT
UP WITH, WAIT TO LOCATE THE HOTWELL UNTIL THE BRACKETS ARE ON.
q
HAND TIGHTEN THE WING NUT ENSURING THAT THE HOT WELL STAYS CENTERED
ON THE COUNTER CUTOUT.
q
REMOVE ANY SILICONE THAT SEEPED INTO THE WELL AFTER TIGHTENING THE
BRACKETS AND NUTS.
ALL AROUND
I n s t a l l a t I o n
U n D e r M o U n t k I t 5 0 2 0 7 9 3 I n s t a l l a t I o n
( o p t I o n )
-
c o n t i n u e D
SERVICE SUPPLEMENT
4/1/16
1
AFFECTED MODELS TO INCLUDE:
100-HW
PURPOSE:
INSTRUCTIONS FOR MOUNTING A 100-HW HOTWELL UNDER A COUNTERTOP
NOTE:
KIT ASSEMBLY # 5020793
TOOLS NEEDED:
PLATE TO MIX EPOXY ON, STICK TO MIX WITH, TAPE, MARKER, SCISSORS, 7/16”
WRENCH, PLIERS
SRV-20035 REV. 1
Alto-Shaam Technical Service 800-558-8744 x6702
1 of 7
KIT 5020793
REV.
ECO
DESCRIPTION
DATE
APP
0
7530
NEW RELEASE
JRK
1
7530
ADDED UNDERMOUNT HARNESS
3/17/2016
JJH
SRV-20035 REV. 1
Alto-Shaam Technical Service 800-558-8744 x6702
q
MIX J-B WELD STEEL AND HARDENER AT 1:1 RATIO (2 OZ WILL BE ENOUGH FOR
FOUR STUDS).
2 of 7
1
2
3
4
BEFORE MIXING
AFTER MIXING
q
SPREAD MIXED EPOXY ON TOP OF BASE PLATE OF STUD. THE EPOXY SHOULD BE
APPROXIMATELY SAME THICKNESS AS THE BASE PLATE.
NOTE:
SCREWING THE WING NUT ALL THE WAY ON AND THEN BACK OFF IS A
GOOD WAY TO CLEAR ANY EPOXY ON THREADS BEFORE IT DRIES.
COVER THREADS WITH
TAPE TO AVOID GETTING
EPOXY ON THEM
q
CLEAN THE BOTTOM SURFACE OF THE COUNTER THAT THE HOT WELL WILL MOUNT
TO (INSIDE CUTOUT SURFACE OF COUNTER MUST BE FINISHED/SEALED FOR
SANITATION PURPOSES. A SOLID SURFACE OR METAL COUNTER IS SUGGESTED).
NOTE:
CUTOUT DIMENSIONS ARE SHOWN IN THE IMAGE BUT ARE NOT INCLUDED IN
THESE INSTRUCTIONS. 6” [153mm] MINIMUM CLEARANCE FROM EACH SIDE OF THE
CUTOUT IS REQUIRED FOR UNDERMOUNT INSTALLATION.
q
USE A PAPER GAUGE (KIT INCLUDES PAPER TEMPLATES - USE SCISSORS TO CUT
THE IMAGES OUT AND FOLD ON DASHED LINES). MARK STUD LOCATION CIRCLES AT
THE CENTER OF EACH OF THE FOUR SIDES OF THE CUTOUT ON THE BOTTOM SIDE
OF THE COUNTER.
NOTE:
IF POSSIBLE, ROTATE COUNTER TO BOTTOM SIDE UP FOR EASIER
INSTALLATION, BUT INSTRUCTIONS ARE INCLUDED IF YOU ARE NOT ABLE TO DO SO.
STUD LOCATION CIRCLE
SRV-20035 REV. 1
Alto-Shaam Technical Service 800-558-8744 x6702
3 of 7
5
6
7
8
q
PRESS STUD ONTO BOTTOM OF COUNTER UNTIL THE EPOXY SEEPS THROUGH
THE HOLES ON THE STUD BASE PLATE.
q
SPREAD EPOXY EVENLY OVER BASE PLATE TO COMPLETELY COVER IT. KEEP
THE EPOXY WITHIN THE DRAWN CIRCLES IN THE COUNTER REFERENCED IN
STEP 2.
q
APPLY TAPE TO HOLD THE STUD IN PLACE IF COUNTER IS BOTTOM SIDE DOWN.
ALSO WRAP TAPE AROUND THE THREADS OF THE STUDS TO PREVENT DRIPS
ONTO THE THREADS.
NOTE:
A DROP CLOTH BELOW ALL THE STUDS IS RECOMMENDED TO CATCH ANY
EPOXY DRIPS.
q
ALLOW EPOXY TO DRY OVERNIGHT (APPROXIMATELY 15 HOURS).
SRV-20035 REV. 1
Alto-Shaam Technical Service 800-558-8744 x6702
4 of 7
9
10
11
12
q
PLACE A BRACKET AND NUT ON EACH STUD AND TIGHTEN EACH UNTIL IT BEGINS
TO GRAB THE BOTTOM OF THE HOT WELL FLANGE. IF THE COUNTER IS BOTTOM
SIDE DOWN, TIGHTEN OPPOSITE SIDES FIRST TO HOLD THE WELL IN PLACE
WHILE YOU TIGHTEN THE REMAINING TWO STUDS.
q
APPLY A LINE OF FOOD GRADE SILICONE ALONG THE TOP FACE OF THE HOT
WELL FLANGE AND PLACE THE HOT WELL CENTERED ON THE CUTOUT.
NOTE:
IF COUNTER IS BOTTOM SIDE DOWN AND YOU HAVE NOTHING TO HOLD IT
UP WITH, WAIT TO LOCATE THE HOTWELL UNTIL THE BRACKETS ARE ON.
q
HAND TIGHTEN THE WING NUT ENSURING THAT THE HOT WELL STAYS CENTERED
ON THE COUNTER CUTOUT.
q
REMOVE ANY SILICONE THAT SEEPED INTO THE WELL AFTER TIGHTENING THE
BRACKETS AND NUTS.
ALL AROUND