
•
Do not store fuel or other combustible
material within marked installation
clearances.
•
Inspect and clean @ues and chimney regular.
Caution
•
Unit is HOT while in operation.
•
Do not touch during operation.
•
Do not operate without the hopper lid, site
tube cover, or ash pan and ash doors in place.
•
Boiler will have multiple hot surfaces.
•
Keep children away.
OPERATION OF
SIGHT HOLE FLAP
/e proper operation of the sight tube @ap is
crucial both in the oD cycle and during fan
operation. /e @ap position during the oD cycle must
be open allowing a gap of 3/8” or more between it
and cover seat. /is allows air to bypass the 1re bed,
preventing over heating of unit during the oD cycle.
/e sight tube @ap is located behind the sight
tube cover. To ensure safety it is imperative that the
sight tube cover be in place during operation.
Sight Tube Cover in Place
Sight Tube Cover Removed
Except for boiler lighting,
maintenance or inspection, the sight
tube cover is not to be removed.
Sight Tube Flap in Open Position
(Sight tube cover removed)
Sight Tube Flap in Closed Position
When the fan is running and boiler is full of coal,
the sight tube @ap must be drawn against the cover
- 23 -
Note: In the photos above, the sight tube is
displayed with the cover removed for
inspection purposes.
Summary of Contents for COAL GUN S130
Page 2: ......
Page 4: ......
Page 34: ...Appendix A Boiler Specification Diagrams 28 ...
Page 35: ... 29 ...
Page 37: ...Appendix B Wiring Diagrams 31 ...
Page 38: ... 32 ...
Page 39: ... 33 ...
Page 40: ...Appendix C Exploded Parts Drawing 34 ...
Page 51: ...Appendix E Troubleshooting Guide 45 ...
Page 54: ...Appendix F Table of Figures 48 ...
Page 57: ...Appendix H Dump Zone Wiring Applications 51 ...
Page 58: ... 52 ...
Page 59: ... 53 ...
Page 60: ... 54 ...
Page 61: ... 55 ...
Page 62: ... 56 ...