
55
INDEX
A
Abrasion shield ................. 39
air supply ............................ 2
Air Supply
combustion .............................. 6
air temperature
in forced-air systems ............. 11
anthracite .......................... 16
Ash removal ............... 19, 39
ASME ................................ 9
automatic fuel delivery ..... 17
B
boiler drain ......................... 9
boiler location ..................... 2
boiler piping ....................... 9
Boiler Room
Requirements .................. 2
C
Cam bearing ..................... 39
CAUTION 2, 4, 9, 10, 11, 16
Ceramic heat shield .......... 39
Chimney
Connection .............................. 4
inspecting .............................. 34
chimney height ................... 4
CHIMNEY
REQUIREMENTS .......... 3
cleanout
chimney................................... 5
clearances
installation............................... 3
coil
air .......................................... 10
Conditioner
Boiler .................................... 10
creosote .............................. 4
Cyclone funnel ................. 40
D
disconnect
electrical ................................. 2
draft
chimney .............................. 3, 4
Draft Controls .................... 6
Sizing ..................................... 8
Drive belt ......................... 39
Drive belts ........................ 34
E
expansion tank ................... 9
EXPLOSION HAZARD3, 18, 19
F
Fire bed ............................ 39
Fire box ............................ 39
floor
installation area ...................... 2
floor drains ......................... 2
Flue pipe .......................... 39
forced hot air systems ...... 10
G
GPM Flow ....................... 26
grate switch ...................... 16
grate timer ........................ 18
H
heat exchange coil ............ 10
hot water
domestic ............................... 11
hot water heater ................ 11
I
Installation ......................1, 2
L
leaks
chimney .................................. 4
Line Loss .......................... 26
low water control .............. 10
low water cut-off .............. 10
low-water cut-off control .. 10
M
Maintenance ..................... 34
manometer .......................... 4
mobile homes
not approved for ..................... 3
moving the boiler................ 2
O
Operating Information ...... 16
Operation and
Maintenance Schedule .. 39
P
pea coal ............................ 16
pitman shaft ...................... 34
Pitman shaft ...................... 39
plumbing
for domestic hot water .......... 11
positioning boiler ................ 2
pressure
measuring ............................... 4
Pressure Drop ................... 26
pressure relief valve ............ 9
R
roller chains ...................... 34
Roller chains ..................... 39
Summary of Contents for COAL GUN S1000
Page 2: ......
Page 4: ......
Page 7: ......
Page 8: ......
Page 29: ...21 the boiler should immediately be taken out of service and thoroughly cleaned ...
Page 30: ...22 APPENDIX A BOILER SPECIFICATION DIAGRAMS ...
Page 31: ...23 ...
Page 32: ...24 ...
Page 33: ...25 ...
Page 35: ...27 APPENDIX B WIRING DIAGRAMS ...
Page 36: ...28 ...
Page 37: ...29 ...
Page 38: ...30 ...
Page 39: ...31 ...
Page 40: ...32 APPENDIX C EXPLODED PARTS DRAWING ...
Page 42: ...34 ...
Page 54: ...46 APPENDIX H DUMP ZONE WIRING APPLICATIONS ...
Page 55: ...47 ...
Page 56: ...48 ...
Page 57: ...49 ...
Page 58: ...50 APPENDIX I BOILER PIPING EXAMPLES ...
Page 62: ...54 IMPORTANT READ AND KEEP IN YOUR POSSESSION ...