SECTION 9 WIRING 

FIG 5 

 

CO2-PG80 WIRING DIAGRAM 

SECTION 10 WARRANTY 

Altec  AIR  warrants the  CO2-PG80  Purge  Gas  Generator  to  be 
free of defects in materials and workmanship under proper use, 
installation  and  application.  This  limited  warranty  shall  cover 
parts  or  replacement  unit  only,  for  a  period  of  18  months  from 
date  of  shipment  or  12  months  from  date  of  installation, 
whichever comes first. 

ALL 

FREIGHT 

DAMAGE 

CLAIMS 

ARE 

NOT 

THE 

RESPONSIBILITY OF THE MANUFACTURER AND ARE NOT 
COVERED  UNDER  WARRANTY  AS  ALL  PRODUCTS  ARE 
SHIPPED  F.O.B.  SHIPPER.  PLEASE  DIRECT  ALL  FREIGHT 
CLAIMS TO THE FREIGHT CARRIER IN QUESTION. 

This warranty does not apply to any unit damaged by accident, 
modification, misuse, negligence, or misapplication. 

Any covered  CO2-PG80  Purge  Gas  Generator  part  or material 
found  defective  will  be  repaired,  replaced  or  refunded,  at  Altec 
AIR

’s option, free of charge, provided that  Altec AIR is notified 

within the above stated warranty period. All returns of defective 
parts/equipment  must  have  prior  written  Returned    Material 
Authorization  (RMA).  RMA  may  be  obtained  from  our  service 
department.  All  defective  parts/equipment  must  be  returned 
freight  prepaid  to  the  Altec  AIR  factory  within  30  days  of  RMA 
issue  date. Any shipment  returned  to  the  factory  collect  will  be 
refused. 

If  an  item  is  found  to  be  warrantable,  the  repaired  item  or 
replacement will be shipped via standard ground freight prepaid 
within the continental US and Canada. 

Any replacement part or material is warranted only to the extent 
of the remaining warranty period of the adsorber/dryer or to the 
extent as provided by the supplier, whichever is longer. 

All freight damage claims should be filed within 15 working 
days and should be directed to the freight carrier.  

Page 8 

P/N P013253 REV B 

 

 

 
 
 
 

 

 
 

 

Tel:  800-521-5351 

226A Commerce St., Broomfield, CO. 80020 

[email protected] 

 

 

Summary of Contents for CO2-PG80

Page 1: ...ety Operation Safety SECTION 3 Specifications Pg 3 Flows Connections Dimensions and Weights SECTION 4 Installation Pg 4 Parts Included Location Install Filters Mounting Electrical Connections Piping and Connections SECTION 5 Start Up Pg 5 SECTION 6 Maintenance Pg 5 SECTION 7 Replacement Parts Pg 6 SECTION 8 Troubleshooting Guide Pg 7 SECTION 9 Wiring Diagram Pg 8 SECTION 10 Warranty Claims Pg 8 P ...

Page 2: ... PPM CO2 when operated at catalog conditions The dry and CO2 free air leaving the top of DESICCANT TOWER A is directed to the outlet through open CHECK VALVE A PURGE ORIFICE B and closed CHECK VALVE B allow a metered portion of the processed air to flow into DESICCANT TOWER B being regenerated The open purge port on deenergized SOLENOID VALVE B and the purge orifice reduce the pressurized dry air ...

Page 3: ...equipment with fluids or gases other than air consult Altec AIR for written approval SECTION 3 SPECIFICATIONS 3 1 FLOWS CONNECTIONS DIMENSIONS AND WEIGHT MODEL NO CO2 PG80 Max Flow Capacities at 125 PSIG L M Inlet Flow 114 Purge Flow 34 Outlet Flow 80 Connections NPT Inlet 1 4 Outlet 1 4 Dimensions Inches Height 27 7 Width 17 2 Depth 6 2 Weight Pounds 25 TABLE 1 OUTLET FLOW CAPACITIES AT VARIOUS I...

Page 4: ...s shown in FIG 2 above Similarly install Outlet Filter Regulator Assy to Right Side of unit 4 4 MOUNTING 1 Table top a The unit comes with rubber feet installed on bottom of cabinet for use on table top 2 Wall mounting a Remove 6 cover screws and remove cover While a helper holds the unit at the mounting location mark the position of the 4 mounting holes at the back of the cabinet Mount the cabine...

Page 5: ...PMENT ENSURE THAT ALL PERSONNEL HAVE READ AND UNDERSTAND THE SAFETY AND OPERATION INSTRUCTIONS IN THIS MANUAL 6 1 PREVENTIVE MAINTENANCE Below is a suggested schedule based on average operating conditions As conditions such as dirty environment humidity conditions ambient temperature etc change the frequency of the inspections may need to be increased Daily 1 Inspect the adsorber dryer for proper ...

Page 6: ...51315 27 PURGE ORIFICE 27 FOR 140 150 PSIG OPER 2 51315 29 PURGE ORIFICE 29 FOR 120 130 PSIG OPER 51315 32 PURGE ORIFICE 32 FOR 80 110 PSIG OPER 51315 40 PURGE ORIFICE 40 FOR 50 70 PSIG OPER SEE TABLE 1 ON PAGE 3 FOR ORIFICES FLOWS 5 O RING PURGE ORIFICE OUTER 2 x 6 51308 MOISTURE INDICATOR WITH O RING NOT SHOWN 1 7 O RING MOISTURE INDICATOR 1 8 51316 BALL CHECK VALVE 2 x 9 51317 SPRING CHECK VALV...

Page 7: ...ation of Verify particle coalescing inlet filtration is Towers must be replaced if contamination desiccant beds adequate and functioning properly is suspected A8 Timing cycle improper Verify correct timing cycle by listening to purge or by using voltmeter across coil connections on timer Replace timer if defective A9 Purge flow restricted Check mufflers for excessive back pressure Replace mufflers...

Page 8: ...found defective will be repaired replaced or refunded at Altec AIR s option free of charge provided that Altec AIR is notified within the above stated warranty period All returns of defective parts equipment must have prior written Returned Material Authorization RMA RMA may be obtained from our service department All defective parts equipment must be returned freight prepaid to the Altec AIR fact...

Reviews: