
3
INSTALLATION INSTRUCTIONS
ADULT INSTALLATION REQUIRED.
TOOLS NEEDED:
• Level
• Measuring tape
• Power drill with 7/32”, 1/8”, and 1/2” masonry bits
• Power screwdriver with bull nose phillips bit
READ ALL INSTRUCTIONS BEFORE ASSEMBLY
Unpack carton and identify all parts (See Parts List on left hand page.)
1. Locate wood stud where left side of changing station will be mounted
to the wall.
2. Measure up 57.5’’ (146cm) from the floor and mark the wall. This locates
the position for the top left attachment hole.
NOTE: Mark on wall MUST be in center of wood stud.
3. Align hole in top left corner of changing station with mark on wall and
hold in place.
4. Using a level and measuring tape, mark the remaining three (3) holes.
After marking holes, set changing station down on ground.
5. Use a power drill and appropriate bit to drill four (4) holes in the wall.
This may require 2 people.
NOTE 1:
FOR WOOD STUDS:
- If finished wall surface is tile or masonry over wood studs,use a 7/32”
masonry bit for the pilot hole until you hit the wood stud, then change
to 1/8” bit.
- Use wood screws, finishing washers and flat washers (See Figure A
on Page 4).