6
Installation
Open the Fillport to fi ll in cooling water
Keep observing the water level gauge while adding water slowly. For the
cooling of carbon steel equipment, the water should be added an appropri-
ate amount of anti-corrosion additives. Working in cold areas, it‘s better to
use noncorrosive antifreeze fl uid.
Connect the water in- and outlet to your cooling circuit
Use two G1/4 fi ttings to connect the chiller with tubes.
Plug in power, turn on the power switch
Do not start up without water in the water reservoir!
1
. The fi rst time of operating may cause more bubbles in the tube leading
to a fl ow alarm. It will go back to normal after a few minutes of operating.
2. Check whether the system leaks immediatly!
3. If the water temperature is below the set value, it is normal the fans and
other components do not work. The temperature controller will automati-
cally control the working conditiond of the compressor, magnetic valve, fans
and other parts based on the set controlling parameters.
4. According to different conditions it may take more time to start the
compressor and other single components. So do not turn off and on again
frequently to avoid damaging parts.
1
2
3
Summary of Contents for Eiszeit 2000
Page 1: ...CHILLER 2000 EISZEIT...
Page 2: ...English...
Page 16: ...Deutsch...
Page 30: ...Fran ais...