background image

3

Min. 1.0

Min. 0.22

2

TECHNICAL DATA

Alpha SolarSmart 150 - Technical Data

2.2

SOLAR COLLECTOR SYSTEM - Per Panel

Max.18.0

Max. 4.0

2.1

DHW SYSTEM

5.5 bar

12 bar

0.1 bar

15 mm

15 mm

152 L

12 L at 2.5 bar

2.5 bar

90°C/7 bar

6 bar

70°C (158°F)

Solar Cylinder

Max. Hot Water Working Pressure

Max. Mains Inlet Pressure 

(inlet of pressure reducing valve)

Min. Mains Water Pressure

Mains Inlet Connection

DHW Outlet Connection

DHW Cylinder Capacity

Expansion Vessel Size (pre-charge press.)

Pressure Reducing Valve Setting

Temperature and Pressure Relief Valve

Expansion Relief Valve Setting

Flow Rate

L/min

gal/min

Max. Outlet Water Temp. (Approx.)

15 mm

15 mm

8 bar

0.32 L

15 mm

22 mm

6 bar

11 L

9 L

110 W/K

6 bar

Drain Back Unit (DBU)

DHW Circuit:

Flow Connection

Return Connection

Max. Working Pressure

Plate Heat Exchanger Content

Collector Circuit:

Flow Connection

Return Connection

Max. Working Pressure

Vessel Size

Max. Filled Content

Heat Transfer Capacity

Expansion Relief Valve

Reference to WRC-NSF Test Procedure 1.50.220 using a 30 kW boiler. Time to reheat water store by 55°C - 25

minutes. Reheat time for 70% of store - 18 minutes

Note: Copper pipe MUST be used between the
cylinder, drain back unit and collectors.

2.5

2.26

45 Gross - 44 Nett

8

95

5

4

Aluminium Pressing

50

0.037

Aluminium Black Powder Coated

10 k

12 mm

15 mm

5.4 GJ/yr (1500 kWh/yr) (2 panels)

74%

3.629

0.9

@80 l/h - 9 kPa

Same as Supporting Roof Structure

Wind Speed 27 m/s - Snow Load 1.9 kN/m

2

4 x 2.3 m

2

 = 9.2 m

2

Landscape

1120 x 2230 x 92

1.10

1030 x 2140 x 0.5

30° Min (90° Max)

Portrait

2230 x 1120 x 92

1.16

2140 x 1030 x 0.5

20° Min (90° Max)

Type:

Dimensions

Total Surface Area

Aperture Area

Length x Width x Thickness

mm

Water Content

L

Lift Weight

kg

Hydraulics

Maximum Pressure

bar

Absorber

Aluminium Cover and Copper Pipe

(Length x Width x Depth)

mm

Spectral Selective Layer

Absorption Coefficient

%

Emission f

%

Glass

Transparent, Hardened - Thickness

mm

Collector Housing

Material

Insulation

Thickness

mm

Thermal conduction coefficient

W/mk

Cover Frame

Material

Temperature Sensor

Type - NTC

Ohm

Connections

Pre-mounted Flexible Hoses

Return to DBU

mm

Flow from DBU

mm

Roof Slope

Energy Performance (System with 90L tank)

Zero Loss Collector Efficiency (No)

Collector Heat Loss Coefficient (a1)

W/m²k

Aperture to Gross Collector Area Ratio

Collector Pressure Drop

Max. Wind and Snow Load

Pitched roof

Flat roof

Max. Collector Array

Profile of collector when fitted using an Alpha flashing kit protrudes approximately 30 mm to 60 mm above the

tiles (depends upon type of tile used)

For latest prices and delivery to your door visit MyTub Ltd - www.mytub.co.uk - [email protected] 0844 556 1818   

Summary of Contents for SolarSmart 150

Page 1: ...Sevenoaks Kent TN157RS For Technical help or for Service call ALPHAHELPLINETel 08448718764 website www alpha innovation co uk Leave these instructions with the User Building Regulations Approved Cert...

Page 2: ...arried using the lifting forks when on the original wooden pallet base IMPORTANT This System has been approved to the Building Regulations for unvented hot water storage systems and the Local Authorit...

Page 3: ...ss 44 Nett 8 95 5 4 Aluminium Pressing 50 0 037 Aluminium Black Powder Coated 10 k 12 mm 15 mm 5 4 GJ yr 1500 kWh yr 2 panels 74 3 629 0 9 80 l h 9 kPa Same as Supporting Roof Structure Wind Speed 27...

Page 4: ...between the solar collectors drain back unit and cylinder MUST be copper with compression fittings on the collector to drain back circuit and compression fittings onto all cylinder connections Supply...

Page 5: ...10 Control PCB 11 Overheat thermostat 12 Drain point for cylinder 13 Unvented kit 14 Expansion relief valve 15 Expansion vessel 16 Non return valve 17 Pressure reducing valve with filter 18 Tundish To...

Page 6: ...prevent high temperatures at the hot water taps it is recommended that a thermostatically controlled mixing valve is fitted after the boiler 3 3 UNVENTED HOT WATER STORAGE SYSTEM To comply with the B...

Page 7: ...hermostat sensor Solar collectors maximum of 4 Drain back unit Drain back unit pump Cylinder pump Heat exchanger Drain point Thermostatically controlled mixing valve Cold water supply Filter Pressure...

Page 8: ...elief valve is 9 m Subtract the resistance for four 22 mm elbows of 0 8 m each 3 2 m Therefore the maximum permitted length equates to 9 3 2 5 8 m 5 8 m is less than the actual length of 7 m therefore...

Page 9: ...it must not be possible for a person using the bath or shower to touch any electrical switch or cylinder control utilising mains electricity The bottom of the Solar cylinder must be located within 6...

Page 10: ...ar collectors 2 The tubing from the solar collectors must always slope down towards the drain back unit at least 40 mm per metre 3 There must not be any part of the tubing that will allow water to col...

Page 11: ...weatherproof Full details of this type of installation are provided in the instructions supplied with the kit b Positioning of a landscape collector onto a flat roof Using the Alpha Flat Roof Kit Part...

Page 12: ...ls Part No 6 4000760 Left hand portrait kit Part No 6 4000780 Right hand portrait kit Part No 6 4000770 Centre portrait kit Part No 6 4000660 Left hand landscape kit Part No 6 4000680 Right hand lands...

Page 13: ...secured in position using the fixings supplied To fit the DBU on wall 1 With the help of Fig 6 decide upon the position of the unit taking into account the clearances required around the unit 2 Remov...

Page 14: ...alve is mounted correctly i e the arrow marking on the valve body is pointing in the direction of flow 5 Connect the mains water supply to the pressure reducing valve and thoroughly flush out the wate...

Page 15: ...late the filling loop after filling the central heating system 23 20 M Brass plug L J H K G I C B F D E A 65 70 45 70 58 95 37 N M Filling loop N 23 20 C B F D E A 65 70 45 70 58 95 37 G I L J H K M N...

Page 16: ...Ensure that the cable is secured in the cable clamp 5 in Fig 18 3 Connect the Collector Sensor The sensor has a 7 metre cable Plug the white sensor cable into the blue connector sensor cable and route...

Page 17: ...ose the ball valve on the manifold to prevent water from draining out of the cylinder Fig 20 5 Remove the relief valve assembly by undoing the socket head capscrew using a 6mm Allen key Fig 20 6 Caref...

Page 18: ...the system can be turned on and off using the button When the button is held in for 5 seconds the diagnostic mode will be entered Refer to Section 7 If the button is not touched for 5 seconds the last...

Page 19: ...ulated around the collector When the heated water enters the drain back unit heat is transfer into the stored water via a heat exchanger coil Stored domestic hot water is pumped from the bottom of the...

Page 20: ...m of the cylinder through the drain back unit heat exchanger and warm water back to the centre of the cylinder Collector water circuit The drain back unit pump See Fig 22 is controlled by the PCB The...

Page 21: ...he side of the cylinder housing Always carry out electrical system checks i e earth continuity resistance to earth short circuit and polarity with a suitable meter after any electrical work has been c...

Page 22: ...BU as it reaches very high temperatures and can emit steam from connections when being removed Isolate the electrical supply before removing the casing Undo the two screws at the top and two screws at...

Page 23: ...r it to stop see fig 20 Drain the water from the cylinder as described in Section 8 1 Undo the four pipe connections on the heat exchanger and the two support bracket nuts and remove the heat exchange...

Page 24: ...n in the collector Check water level in drain back unit Check overheat thermostat manually reset if required Check the difference in height between the drain back unit pump and the upper most side of...

Page 25: ...reducing valve situated Has the expansion vessel or internal air space been checked Yes No FOR ALL INSTALLATIONS CONFIRM THE FOLLOWING The hot water system complies with current Building Regulations...

Page 26: ...nbackrighttailconnection Expansionreliefvalve Collectortemperaturesensorlead Plugandlead overheatthermostst Collector hoses fittings DBU to collector HT pipe insulation pack DBU to collector Clips cyl...

Page 27: ...ts Date of Installation Name of Installer Address Postcode Telephone No Cylinder Serial Number see data label on top of cylinder underneath the cover or bottom of cylinder refer to Fig 5a for position...

Page 28: ...specification at any time in the interest of product improvement Alpha Therm Limited 2010 Alpha Therm Limited NepicarHouse LondonRoad WrothamHeath Sevenoaks Kent TN15 7RS Tel 0844 8718764 email info a...

Reviews: