Loosen quick-release screws. Turn counter-clock-
wise 90°…
On both sides, pull lower facing panel upward and
outward, detach and set securely aside.
LIFTING THE UNIT WITH PIPES
(only LW 71… through LW 180…)
The units LW 71… through LW 180… can be lifted with
¾” pipes (provided by customer) that are suitable for
the weight of the respective unit. Special holes are pro-
vided in the frame for this purpose.
NOTICE
For mode LW 251… and higher, lifting with pipes
is not possible.
Proceed as follows:
Insert the pipes through the holes in the frame on
the switch cabinet side (= operator side)…
LW 71… / LW 81…:
NOTICE
Set up the unit so that the switch cabinet side (=
operating side) is accessible at all times.
PREPARING FOR INSTALLATION
LW 71… / LW 81…:
Remove facing panels on the switch cabinet side (=
operator side) and the water connection side of the
unit…
Loosen quick-release screws. Turn counter-clock-
wise 90°…
On both sides, pull facing panel outward, detach at
top and set securely aside.
LW 101… THROUGH LW 180…:
Remove lower facing panels on the switch cabinet
side (= operator side) and the water connection
side of the unit…
1 Quick-release screws
2 Lower facing panel
Summary of Contents for LW A Series