12
4.1
UNPACKING
1.
The boxes required when the boiler is installed with a horizontal flue are as follows:-
Box 1
Cased boiler fitted with water and gas valves, union bends and washers
Mounting bracket plus screws and wall plugs
Flue terminal and wall sealing collar plus 2 screws
Pressure reducing valve
Tundish
Literature pack and Wall template
Box 2
90° flue bend with clamp (not required for vertical flue)
Box 3
0.75 m flue (for side and rear flue) with two clamps and inner duct support
2.
Unpack boiler and remove loose items detailed (box 1).
3.
Remove the two screws at the bottom of the front casing. Pull the casing out at the bottom and lift it off.
4.2
CLEARANCES REQUIRED - Fig. 10
Alpha CB50 - Installation
4
INSTALLATION
4.3
PREPARE THE WALL - Fig. 11
1.
Decide upon the position of the boiler taking into
account the clearances required for servicing and
the flue terminal position.
2.
Tape the template to the wall (ensure it is level
and the right way up) and mark the position of the
holes for the boiler mounting bracket. If rear exit
flue is used, mark the position of the hole for the
flue.
3.
Side exit flue - Continue the horizontal centre line of
the flue across the wall to the side wall, then along
the side wall 235 mm (ensure the lines are horizontal).
This will give the position of the centre of the hole for
the flue.
4.
Cut the 110 mm diameter hole (or use a 107 mm
core drill) in the wall for the flue.
Note: For internal fitting of the flue using the
sealing collar supplied, cut a 127 mm diameter
flue hole using a 127 mm core drill.
5.
Drill the fixing holes (10 mm dia.) to accept the
No. 10 plugs supplied. Using the screws supplied,
fit the mounting bracket.
Fig. 10
Fig. 11
220 mm
10 mm
10 mm
600 mm
250 mm
450 mm
900 mm
Minimum
clearance
of 450 mm
from front
of boiler
420 mm
180 mm
Rear exit hole
110 mm dia.
Position of
110 mm hole
to be cut for
side exit
flue
Ensure line is level
Wall
mounting
bracket
Side
wall
235 mm
Boiler
outline
Template
Fixing
holes
140 mm
Summary of Contents for Alpha CB50 Boiler
Page 29: ...29 9 WIRING DIAGRAMS 9 1 ILLUSTRATED WIRING DIAGRAM Alpha CB50 Wiring Diagrams ...
Page 30: ...30 9 2 FUNCTIONAL FLOW WIRING DIAGRAM Alpha CB50 Wiring Diagrams ...
Page 32: ...32 Alpha CB50 Fault Finding 10 3 DOMESTIC HOT WATER Follow operational sequence ...
Page 33: ...33 Alpha CB50 Fault Finding 10 4 FAULT FINDING SOLUTIONS A to F ...
Page 34: ...34 Alpha CB50 Fault Finding 10 5 FAULT FINDING SOLUTION SECTIONS G to L ...