background image

                                                                                                                 

TST200 User

s Manual

 

                                                                                                                                    1 / 11 

 

 

 

 

 

 

 

 

 

TST200 series 

Static Transfer Switch 

 

 

 

 

USER MANUAL 

Version 1.0 

Date: Nov 2009 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Summary of Contents for TST200 series

Page 1: ...TST200 User s Manual 1 11 TST200 series Static Transfer Switch USER MANUAL Version 1 0 Date Nov 2009...

Page 2: ...sting and burn in through out the production process Power is certified by TUV in accordance with ISO9001 and can be your reliable power solution provider D Di is sc cl la ai im me er r Unless special...

Page 3: ...de well for later reference The TST200 needs to be installed by professionals and please pay attention to the following points prior to installation 1 Please check the input voltage or voltage of batt...

Page 4: ...o commencing the installation Please follow the local stipulation meantime Any operation against safety requirement or against design manufacture safety standard and are out of the manufacturer warran...

Page 5: ...of STS maintenance l Hot pluggable l Transfer time less than 4ms when input power are synchronization and transfer time is less than 10ms in case of input non synchronization l Integrated Maintenance...

Page 6: ...ion Temp 5C 40C Storage Temp 25C 60C Humidity 93 non condensing Communication RS485 Dry contacts 2 2 3 3 S Sy ys st te em m P Pr ri in nc ci ip pl le e MAIN CNTROL CUR LED DRY CONTACT RS485 CUR K1 3 I...

Page 7: ...e in synchronization Green input 1 normal 2 Input 1 Red input 1 fault 3 Output 1 Green output using input 1 Green Output normal 4 Output Red Output fault 5 Switch switching between input 1 and input 2...

Page 8: ...on fault 1 Dry contact Left 4 Input 2 fault 2 Circuit breaker Input 1 circuit breaker 3 Connector Input 1 L 4 Connector Input 1 N 5 Connector Earth 6 Connector Input 2 L 7 Connector Input 2 N 8 Circui...

Page 9: ...dule and subrack is same to that on outer carton 4 4 2 2 L Lo oc ca at ti io on n Please install the equipment in a location of Dry Clean Cool with good ventilation l Working temperature 0 40 l Storag...

Page 10: ...nd repeat the above action until it is firmly secured 4 4 4 4 2 2 C Co on nn ne ec ct ti in ng g t th he e c ca ab bl le e For the user operation safety cut off the power before installation Connect A...

Page 11: ...e input 1 switch the STS will resume to input 1 At auto position you can not manually choose input 1 or input 2 5 5 4 4 M Ma ai in nt te en na an nc ce e B By yp pa as ss s T Te es st t Plug out the S...

Reviews: