4.2. Selecting Installation Position
The UPS is heavy. Select a location sturdy enough to support the UPS
weight.
To ensure proper operation and long operating life, position the UPS
according to the following requirements.
1. Keep at least 20 cm (8 inches) of
clearance beyond the rear panel of the
UPS.
2. Do not block the air flow to the ventilation
louvers of the unit.
3. Ensure that the installation site is
free from excessive dust and the
ambient temperature and humidity
are within the specified limits.
4. Do not place the UPS in a dusty or
corrosive environment or near any
flammable objects.
5. This UPS is not designed for
outdoor use.
4.3. Operation
4.3.1. Using the standard LED panel
4.3.1.1. Start Up in Normal AC Mode
1.
Before commencing ensure that the grounding is connected
properly.
2.
Ensure that the utility voltage matches the input voltage window of
the UPS.
3.
Connect the UPS main power cord into the utility AC power
source receptacle.
4.
Switch on the AC power source. All of the LEDs on the front panel
display will flash once after five seconds. At the same time, the
fan at the front of the UPS will start operating.
5.
Press and hold the ON button ‘
’ for approximately one
second to start the UPS. The buzzer will beep and the LED
indicators " ", "
","
"and "
" will shine after 1-5
seconds. The start-up procedure is now completed, and the UPS
outlets are ready to supply power to the load.
6.
It is advisable to perform a battery mode test before connecting
the loads to the UPS to ensure that the batteries are working
properly. To do this, switch off the AC power source when the
UPS is on. The LED on the front panel display will turn off,
the LED will shine, and the buzzer will pulsate, indicating that
the UPS is in Battery Mode. Connect a non-critical load to the
UPS outlets to confirm that the batteries are supplying power.
Repeat the test by switching on and off the AC power source to
ensure that the UPS is functioning properly.
Page
1
8
to
47
Page
1
9
to
47