13
Subject to technical amendments without prior notice | 83072100aUK | ait-deutschland GmbH
7. Use spanner size SW 37 to unscrew the heating
flow (
⑤
).
5
8. Disconnect the hydraulic connections; to do this,
push the pipes (
⑥
) apart as far as necessary.
6
9. Remove the 2 side retaining screws.
10.
To protect the floor and move the module box
(⑦)
more easily: place boards
(8)
under it, e.g. from
the packaging material.
7
8
11. Lift and hold nut
(⑨)
on the heating flow.
10
9
12. Slowly and carefully pull out the module box by
the carrying lugs
(⑩)
. Ensure that none of the
pipes are damaged
13. Pull out the module box completely and place it
on the boards.
Summary of Contents for WZSV 42K3M
Page 1: ...UK 83072100aUK Brine Water Heat Pumps Brine heat station Operating Manual WZSV 42K3M...
Page 31: ...31 Subject to technical amendments without prior notice 83072100aUK ait deutschland GmbH...
Page 39: ...39 Subject to technical amendments without prior notice 83072100aUK ait deutschland GmbH...