11
Subject to change without notice | 83050700fUK – Translation into English of the original German operating manual | ait-deutschland GmbH
Proceed as follows at the installation location:
If you have no already done so, remove angle
bracket, transport and packaging material from the
unit. Set the extra box to the side and lift the unit
from the wooden pallet...
“Transport to installation location”.
Dispose of angle bracket, transport and packaging
material properly and in an ecologically compatible
way...
Set unit on a stable, solid and level, preferably
sound-insulated surface. Ensure that the floor is
designed for the weight of the heat pump...
Set up the unit so that the switchbox side (= opera-
tor side) is accessible at all times...
“Technical data/Scope of delivery” overview,
“General unit data” section.
Use the Sylomer strips supplied to level out any
minor unevenness.
The Sylomer strips give the heat pump additional
stability. They absorb sound and vibrations transfer
to the floor.
Place the Sylomer strips under the heat pump as fol-
lows:
•
Tilt the unit to one side, slowly and carefully...
Secure unit in raised tilted position so that it cannot
accidentally tip back into the original position.
IMPORTANT
Do not tilt the unit more than a maximum of 45°
(in any direction).
CAUTION!
Hands and fingers could be crushed during
the following work!
•
Position a Sylomer strip under the unit, flush with
the respective outer edge...
•
Slowly and carefully tilt the unit back into its initial
position.
Repeat steps • to • for the remaining sides
of the unit.
Position Sylomer strips at right angles to each other,
end-to-end:
Front side of unit (= operator side)