![Alpha ESS T100 Installation & Operation Manual Download Page 39](http://html.mh-extra.com/html/alpha-ess/t100/t100_installation-and-operation-manual_2905584039.webp)
______________________________________________________________________
Alpha ESS Co., Ltd.
Page 39 of 45
Your Smart Energy
Insulating
paint
Fixing on
modules
Work clothes;
Protective
shoes;
Wrench
3 months
Fixing between modules and
brackets
Connecting
cooper bar
fixing
Work clothes;
Protective
shoes;
Wrench
3 months
Serial copper bars
Insulation
protection
Work clothes;
Protective
shoes;
3 months
Protecting cover on module poles
Module
tamper
proof labels
Work clothes;
Protective
shoes;
3 months
Tamper proof labels
Module
grounding
Work clothes;
Protective
shoes;
Wrench
3 months
Use multimeter to test grounding.
Battery
capacity
calibration
Work clothes;
Protective
shoes;
6 months
Whole discharge-charge-
discharge cycle
Battery data
analyze
Work clothes;
Protective
shoes;
6 months
Analyze BMS data recorded
(
by
Alpha staff)
Junction
box
Junction
box cable
terminal
fixing
Work clothes;
Protective
shoes;
Wrench
6 months
All bolts are tight
PCS
Operating
status and
environmen
t of the
system
Work clothes;
Protective
shoes;
6 months
Check whether the converter is
damaged or deformed or not.
Listen whether abnormal sound is
available during the operation of
converter.
Check all varieties during the
operation of converter.
Check whether the major parts are
Ok or not.
Check the heating of converter`s
case and use thermal imager to