______________________________________________________________________
Alpha ESS Co., Ltd.
Page 35 of 45
Your Smart Energy
6.
Routine Maintenance
Maintenance Plan
check if wire connection loose
check if cables aged/damaged
check if cable insulating ribbon drop
check if cable terminal screw loose, any overheat sign
check if ground connection is well
Routine Inspection
Item
Details
Frequency
Training/qualificat
ion requirements
Minimum PPE
(Personal
protection
equipment)
Notes
Foundation
Check the
foundation for tilt
or sink
Once
6 months
No tilt or sink
Work cloth;
Protective shoes
Container
surface
Check the
container
surface for
rusting or
damage
Once
6 months
No rusting or
damage on
container surface
Work cloth;
Protective shoes
Container
door
Check the
container door
for damage
Once
6 months
The doors should
be opened and
closed normally
Work cloth;
Protective shoes
Indicate
light
Check the
indicator lights
outside the
container for
damage
Once
6 months
No flashing lights or
ringing bells outside
Work cloth;
Protective shoes
Footing
Check the
earthing bar of
the container for
rusting.
Once
6 months
No rusting
Work cloth;
Protective shoes
Inside
environmen
t
Check the
container
passage; the
passage should
be tidy
Once
6 month
The passage
should be clean
and tidy and the
ground mat should
not be damaged
Work cloth;
Protective shoes
Air
conditioner
Check the air
conditioner
Once
6 months
The air conditioner
should work
Work cloth;
Protective shoes