1
1
2
2
3
3
4
4
5
5
6
6
A
A
B
B
C
C
D
D
Marcin Lipka
04.01.2022
Zaprojektowany przez
Sprawdzony prze
Zatwierdzony przez
Data
1 / 1
Wydanie
Arkusz
Data
Wkr
ę
t do EPP
1 : 1
Marcin Lipka
Zaprojektowany przez
Sprawdzony przez
Zatwierdzony przez
Data
Materia
ł
Skala
1:5
A3
Nazwa cz
ęś
ci
Format
Masa
Data
Data
04.01.2022
Nie
dotyczy
39
ALNOR
®
ventilation systems
is a legally protected trademark and technical patent. All rights reserved.
w
w
w
.al
nor
.com.
pl
User Manual
HRU-MinistAIR
4.2 Floor mounting of the unit
Prepare 4 mounting feet and 12 plastic screws for EPP for correct floor installation of the unit. Then tighten
them with screws in the places intended for them as shown in Fig. 5.
Fig. 6 - Installation of the condensate drain
Fig. 5 - Installation of the feet
In order to install the trap in a given position, carefully place the flexible hose on the unplugged condensate
connector pipe. Construct the trap with a flexible hose and clip (Fig. 6). When the trap is ready and connected
to the waste water system, fill it in water.
screw for EPP