PAGE
80
ALMAC s.r.l.
6.1.2
Checks before each use
Prior to commissioning and before each use the machine must undergo the visual
and functional checks given below.
The instructions given below must be followed.
VISUAL CHECK
CHECK OPERATION
•
Make sure that there is no hydraulic oil
leaking from the hoses and from the
other
components
(cylinders,
distributors, fittings, etc.).
•
Check that there are no cut or worn
electrical
cables
and
that
the
connectors are correctly secured.
•
Check the hydraulic oil level.
•
Make sure that none of the screws,
bolts or ferrules are loose or missing.
•
Make sure that all the pins are in place
and correctly secured.
•
Make sure the tracks are not cut or
abnormally worn.
•
Always check to make sure that track
tension is correct.
•
Check that the manual, the plates and
the stickers are on the machine.
•
Check that the steel structure is not
deformed.
•
Make sure there are no cracks in the
welds, damage or abnormal wear.
•
Position the machine with the frame inclined to
the horizontal with a value greater than 0.5°
on the side. Operate the automatic levelling
control and make sure that the system
automatically keeps the frame horizontal.
•
Position the machine with the frame inclined to
the horizontal by a value greater than 0.5° on
the longitudinal. Operate the automatic
levelling control and make sure that the system
automatically keeps the frame horizontal.
•
Position the machine with the frame inclined to
the horizontal at the maximum angle both on
the longitudinal and on the side. Operate the
automatic levelling control and make sure that
the system automatically keeps the frame
horizontal.
•
Operate the emergency button on the remote
control; make sure that the machine is
switched off and that no function is permitted.
Release the mushroom-shaped button after this
test.
•
Operate the emergency button on the ground,
check that the machine is switched off and that
no function is possible. Release the mushroom-
shaped button after this test.
•
Operate the emergency buttons on the sides of
the machine, make sure that the vehicle is
switched off and that no function is permitted.
Release the mushroom-shaped button after this
test.
•
Operate the warning buzzer and make sure it
works.
•
Check the operation of the buzzer when the
drive function is activated.
•
Check with the machine in translation (with
translation selector in DM) that releasing the
Joysticks the machine stops immediately.
Summary of Contents for MULTI-LOADER 2.5
Page 41: ...PAGE 41 ALMAC s r l...
Page 67: ...PAGE 67 ALMAC s r l A number of examples follow...
Page 68: ...PAGE 68 ALMAC s r l...
Page 69: ...PAGE 69 ALMAC s r l...
Page 105: ...PAGE 105 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity FAC SIMILE...
Page 107: ...PAGE 107 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 117: ...PAGE 117 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...