Checks on the machine before each use
•
Make sure that there is no hydraulic oil leaking from the hoses and from the
other components (cylinders, distributors, fittings, etc.).
•
Check that there are no cut or worn electrical cables and that the
connectors are correctly secured.
•
Check the hydraulic oil level.
•
Check that no screw, bolt or ring nut is loose or missing.
•
Make sure that all the pins are in place and correctly secured.
•
Check that the steel structure is not deformed.
•
Make sure there are no cracks in the welds, damage or abnormal wear.
•
Make sure the tracks are not cut or abnormally worn.
•
Always check to make sure that track tension is correct.
•
Check that the manual, the plates and the stickers are on the machine.
2.6
General safety instructions on use of the machine
The instructions given below must be followed.
•
It is forbidden to work near high voltage overhead electric power lines.
Moreover, the control stations must always be kept at a safety distance of at
least 5 m from cables. For voltages greater than 132KV, refer to the table
below.
Nominal voltage (kV)
Minimum distance (m)
≤ 1
3
1 < Un ≤ 30
3.5
30 < Un ≤ 132
5
> 132
7
•
Do not use the machine during storms. You could be struck by lightning.
•
Use the machine only in the temperature range permitted.
•
It is forbidden to exceed the machine's capacity.
•
It is forbidden to use the machine on soft, slippery or non-consistent soils.
Summary of Contents for MULTI-LOADER 2.5
Page 41: ...PAGE 41 ALMAC s r l...
Page 67: ...PAGE 67 ALMAC s r l A number of examples follow...
Page 68: ...PAGE 68 ALMAC s r l...
Page 69: ...PAGE 69 ALMAC s r l...
Page 105: ...PAGE 105 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity FAC SIMILE...
Page 107: ...PAGE 107 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 117: ...PAGE 117 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...