
POWERFLEX G2426 Managed GbE PoE Switch
Quick Installation and Initial Configuration Guide
Page 8
Toll Free 1-866-
ALLWORX • 585
-421-
3850
www.allworx.com
Version: A Revised:
August 16, 2017
Connecting the AC Power Cord
Step 1:
Connect the AC power cord to the AC power receptacle of
switch.
Step 2:
Connect the other end of the AC power cord to the AC power
outlet.
Step 3:
Check the SYS LED. If it is ON, the power connection is correct.
Figure 6: Connecting AC power cord
Installing SFP Modules
You can install or remove a mini-GBIC SFP module from a SFP port
without having to power off the switch.
Step 1:
Insert the module into the SFP port.
Step 2:
Press firmly to ensure that the module seats into the connector.