
All
SportSystems, Inc.
©
2020.
BLACKOUT™ - What’s Included…
Pole Sleeves
(4 ea):
Four pole sleeves are used to cover the depth poles along the top and bottom
on each side. These are installed prior to netting, screen, SideRite™, and ShotDefender see
- Install BlackOut™ Pole Sleeves
.
Cascading Panels
(7ea or more):
Cascading panels are installed first to cover the sides and top.
Two overlapping panels (A & B) are placed on each side. Three or more overlapping panels (A,B, and
C) are placed on the top.
● A Panels (3 ea) - Lower-right side; Top-right, and Upper-Left side.
● B Panels (3 ea) - Upper-right side; Top-left and Lower-right.
● C Panel (1 or more* ) - Top-middle.
* Additional C Panels may be included depending on the width of your enclosure.
Ridge Cap
(2 ea):
Ridge caps are installed after cascading panels to cover the upper left and right
corners.
Rear Panel
(1 ea)
:
The Rear panel is installed last to close in the back of the enclosure.
BlackOut™ Panel Overview Showing...
Type
,
Location
, and
Order
of cascading panel installation.
See the following pages for BlackOut™ installation instructions.
Page 31 of 48
February 3, 2020