11
Installation
Before installing the switch, we strongly
recommend:
1. The switch is placed with appropriate
ventilation environment. A minimum
25mm space
around
the unit
is
recommended.
2. The switch and the relevant components
are away from sources of electrical noise
such
as
radios,
transmitters
and
broadband amplifiers.
3. The switch is away from environments
beyond recommend moisture.
Steps of Installation
1. Attach the provided robber feet to the
bottom of the switch to keep the switch
from slipping. The recommend position
has been square-marked.
2. Install the switch on a level surface that
can support the weight of the unit and
the relevant components.
Summary of Contents for ALL-SG8205PD
Page 1: ...ALL SG8205PD 5 Port unmanaged Gigabit Switch with 1 Port PD and 2 Ports PoE USER MANUAL ...
Page 18: ...18 ...
Page 19: ...19 ...