ASSEMBLING THE OPERATOR AND LEVERS
Insert the motor into the
foundation case and fixit with
nuts and washers supplied
Insert the ball in the pin located
on the box and fit the gate
anchorage lever (L1)
Put the connection lever(L2)
between the levers (L3) and
(L4) and block it with screws
and washers supplied
BALL
Pag. 7
L 1
L 1
L 2
L 3