![Allmand TLB 220 Operator'S Manual Download Page 13](http://html1.mh-extra.com/html/allmand/tlb-220/tlb-220_operators-manual_2903316013.webp)
13
!
KEEP ROPS INSTALLED PROPERLY
Make certain all parts are reinstalled correctly if the roll-over
protective structure (ROPS) has been loosened or removed
for any reason.
TORQUE ALL ½” MOUNTING BOLTS TO 37 lb./ft.
CAUTION
This Roll Over Protective Structure (ROPS) has been certified to industry and/or government
standards. Any damage or alteration to ROPS, mounting hardware, or seat belt voids the
certification and will reduce or eliminate protection for the operator in the event of a rollover.
The ROPS, mounting hardware, (proper torque-37 lb./ft
)
and seat belt should be checked after
the first 100 hours of machine operation and every 500 hours thereafter for any evidence of
damage, wear, or cracks. In the event of damage or alteration, the ROPS must be replaced
prior to further operation of the machine
Not
for
Reproduction
Summary of Contents for TLB 220
Page 39: ...39 LOADER LIFT AND BUCKET ROLL BACK continued N o t f o r R e p r o d u c t i o n...
Page 41: ...41 HYDRAULIC SCHEMATIC Allmand TLB Diesel Engine Tractors N o t f o r R e p r o d u c t i o n...
Page 46: ...46 WIRING SCHEMATIC FOR OPTIONAL EQUIPMENT N o t f o r R e p r o d u c t i o n...
Page 48: ...48 FORWARD REVERSE PEDAL ASSEMBLY TLB 220 225 and 325 N o t f o r R e p r o d u c t i o n...
Page 51: ...51 THIS PAGE LEFT BLANK INTENTIONALLY N o t f o r R e p r o d u c t i o n...