![Allmand Maxi-Lite II Installation Instructions Manual Download Page 7](http://html1.mh-extra.com/html/allmand/maxi-lite-ii/maxi-lite-ii_installation-instructions-manual_2903341007.webp)
18. From the kit contents, locate and select the yellow
16 AWG wire (
U
, Figure 18, Ref. 2). Cut the yellow
16 AWG wire in half. Keep one half of the wire, and
discard the other half of the wire. Strip the ends of the
cut wire, and crimp a blue fork terminal (
V
, Figure 18,
Ref. 8) on one of the ends.
7
en
English
19. Install the fork terminal end of the yellow wire (
W
,
Figure 19a-b) on DC post 2 of the 725 light relay.
Then, install the bare wire end of the yellow wire into
one of the open ports of the 3 port lever lock (
X
, Figure
19a-b) that was installed in Step 20.
20. Check and make sure all connections are secure and
tightened.
21. The wiring is now complete. Close the AC front panel,
reconnect the battery, start the engine and turn on the
lights to make sure all are operating correctly.
22.
Once the unit is verified to be operating correctly,
re-install the rear door panel.
13
U
V
11a
X
W
725 Relay
Connection Detail
11b
X
725 Relay
W
1. Locate and remove the rear door panel (
A
, Figure
1) from the unit. Set the door panel, bolts nuts, and
washers aside as they will be re-installed in Step 29.
1
A
Kit Installation: 4-Light Replacement
725 Relays for Zettler Relay 3, or
6-Light Replacement 725 Relays for
Zettler Relays 1, 2, and 3
2. Remove hardware from the AC front panel (
B
, Figure
2) of the component box and lay open the panel. Set
the hardware aside as they will be re-installed in Step
28.
725 Relay
Not for
Reproduction