508298-01
Page 31 of 55
Issue 2219
Figure 47. Unit with Evaporator Coil
A separate drain line must be run to the drain from the
condensate trap to ensure proper drainage and pressure
switch operation.
DO NOT
connect the condensate trap
drain into the drain line from the evaporator coil.
CAUTION
When combining the furnace and evaporator coil
drains together, the A/C condensate drain outlet must
be vented to relieve pressure in order for the furnace
pressure switch to operate properly.
IMPORTANT
Figure 48. Evaporator Coil Using a Common Drain
Figure 49.
Condensate Trap with Optional Overflow
Switch
Summary of Contents for A96DF1E
Page 32: ...508298 01 Page 32 of 55 Issue 2219 Figure 50 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Page 51: ...508298 01 Page 51 of 55 Issue 2219 Troubleshooting Heating Sequence of Operation ...
Page 52: ...508298 01 Page 52 of 55 Issue 2219 Troubleshooting Heating Sequence of Operation continued ...
Page 53: ...508298 01 Page 53 of 55 Issue 2219 Troubleshooting Cooling Sequence of Operation ...
Page 54: ...508298 01 Page 54 of 55 Issue 2219 Troubleshooting Continuous Fan Sequence of Operation ...