
14
Operation - 295 Loader
Do not use bucket in dumped position for
bulldozing. This will only impose severe shock
loading on the bucket cylinders and make it
more difficult to maintain a level grade.
When backfilling approach pile with a flat
bucket. Leave dirt in bucket. Dumping on each
pass wastes time.
Backgrade work surface with a loaded bucket.
Release all pressure on lift cylinders so full
weight of bucket is scraping ground. Use heel
of bucket
DO THIS
WARNING
Do not use loader as battering ram!
Operating Suggestions for Backfilling
Summary of Contents for 295
Page 1: ...Operator and Parts Manual 012012 Loader Models 295 P1582 ...
Page 2: ......
Page 6: ...6 Specifications 295 Loader Specifications ...
Page 10: ...10 Safety 295 Loader Safety Decals ...
Page 11: ...11 Safety 295 Loader Important Precautions ...
Page 24: ...24 Parts 295 Loader Sub Frame Assembly ...
Page 26: ...26 Parts 295 Loader Main Frame Assembly ...
Page 28: ...28 Parts 295 Loader Hydraulic Plumbing Assembly ...
Page 35: ......