Chapter 5: Installing the Switch in an Equipment Rack
122
You can use the different sets of holes on the switch to install the switch in
the equipment rack in a variety of orientations. You can install it with the
front panel flush with, extending in front of, or recessed behind the front of
the equipment rack. Refer to Figure 65.
Figure 65. Switch Orientations in an Equipment Rack
Installing the
Switch
If you have not chosen an orientation for the switch in the equipment rack,
review “Switch Orientations in the Equipment Rack” on page 121.
Please review the installation guidelines in “Choosing a Site for the
Switch” on page 95 before installing the switch in an equipment rack.
Caution
The chassis can be heavy and awkward to lift. Allied Telesis
recommends that you get assistance when mounting the chassis in
an equipment rack.
E28
Summary of Contents for x530L Series
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 56: ...Chapter 1 Overview 56 ...
Page 88: ...Chapter 2 Virtual Chassis Stacking 88 ...
Page 140: ...Chapter 6 Installing the Switch on a Wall 140 ...
Page 202: ...Chapter 8 Building the Stack Trunk with 5Gbps Multi Speed Ports 202 ...