AT-FS750/24POE Fast Ethernet WebSmart Switch Installation Guide
51
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 53.
Note
The switch is now powered on and ready for network operations. To
start a local management session on the switch, refer to “Starting a
Management Session” on page 52. For more information about
staring a remote management session, see the
AT-S105
Management Software User’s Guide
.
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
E5