
Chapter 2: Installation
38
Powering On the Switch
To power on the switch, perform the following procedure:
1. Plug the power cord into the AC power connector on the back of the
switch, as shown in Figure 14.
Figure 14. Plugging in the AC Power Cord
2. Plug the other end of the power cord into a wall outlet.
3. Verify that the POWER LED is green. If the LED is OFF, refer to
Chapter 3, “Troubleshooting” on page 39.
The switch is now powered on and ready for network operations. For
information on how to manage the switch, refer to the
AT-S80
Management Software User’s Guide
.
Warning:
Power cord is used as a disconnection device. To de-
energize equipment, disconnect the power cord.
E3
Pluggable Equipment. The socket outlet shall be installed near
the equipment and shall be easily accessible.
E5
871
Summary of Contents for FS750/16
Page 1: ...613 000354 Rev B Fast Ethernet Smart Switches AT FS750 16 AT FS750 24 Installation Guide ...
Page 6: ...Contents 6 ...
Page 8: ...Figures 8 ...
Page 10: ...Tables 10 ...
Page 24: ...Chapter 1 Overview 24 ...
Page 40: ...Chapter 3 Troubleshooting 40 ...