
Chapter 1: Overview
20
Each of the 10/100Base-TX ports has two LEDs, described in Table 3.
Table 4 describes the LEDs for the uplink combo ports.
Table 3. 10/100Base-TX Port LEDs
LED
State
Description
SPEED
On
The port is operating at 100 Mbps.
Off
The port is operating at 10 Mbps or it has not
established a link to an end node.
LINK/ACT Green
The port has established a valid link.
Blinking
Green
The port is transmitting or receiving data.
Off
No link is established on the port.
Table 4. Uplink Combo Port LEDs
LED
State
Description
1000M
Green
The uplink port has established a valid 1000
Mbps link with an end node.
Off
1
1. The port has established a valid 10 Mbps link when both the 1000M and the 100M LEDs are Off and the LINK/ACT LED is Green.
No 1000 Mbps link is established on the
uplink port.
100M
Green
A valid 100 Mbps link is established between
the uplink port and the end node.
Off
1
No 100 Mbps link is established on the uplink
port.
LINK/ACT Green
1
A valid link is established on the uplink port.
Blinking
Green
The uplink port is transmitting or receiving
data.
Off
No link is established on the port.
Summary of Contents for FS750/16
Page 1: ...613 000354 Rev B Fast Ethernet Smart Switches AT FS750 16 AT FS750 24 Installation Guide ...
Page 6: ...Contents 6 ...
Page 8: ...Figures 8 ...
Page 10: ...Tables 10 ...
Page 24: ...Chapter 1 Overview 24 ...
Page 40: ...Chapter 3 Troubleshooting 40 ...