7
Figure 1. AT-CV1000 One-Slot Converteon™ Chassis...................................................................................................... 14
Figure 2. AT-CV1000 Chassis Front and Back Panels....................................................................................................... 15
Figure 3. AT-CV5PNL1 Blank Slot Cover ........................................................................................................................... 17
Figure 4. AC Power Adapter............................................................................................................................................... 18
Figure 5. Standalone Network Topology ............................................................................................................................ 19
Figure 6. Back-to-Back Network Topology ......................................................................................................................... 20
Figure 7. Attaching Rubber Feet ........................................................................................................................................ 25
Figure 8. Installing the Wall-Mount Brackets on the Chassis ............................................................................................. 26
Figure 9. Installing the Plastic Anchors and Screws Onto the Wall .................................................................................... 27
Figure 10. Positioning The AT-CV1000 Chassis Onto the Wall Screws............................................................................. 27
Figure 11. AT-CVMCR Installation Adapter........................................................................................................................ 28
Figure 12. Removing the Mounting Rail from a Slot in the AT-MCR12 Chassis ................................................................ 29
Figure 13. Installing the AT-CVMCR Adapter on the AT-CV1000 Chassis ........................................................................ 29
Figure 14. AT-CV1000 Chassis with AT-CVMCR Adapter Installed................................................................................... 30
Figure 15. Sliding the AT-CV1000 into the AT-MCR12 Chassis Slot ................................................................................. 30
Figure 16. Tightening the Captive Screw on the AT-CVMCR Adapter ............................................................................... 31
Figure 17. Location of the Alignment Guides...................................................................................................................... 33
Figure 18. Inserting a Line Card ......................................................................................................................................... 33
Figure 19. Tightening the Captive Screw............................................................................................................................ 34
Figure 20. Connecting the Power Adapter and Power Cord............................................................................................... 35
Figure 21. Inserting an AT-CV5PNL1 Blank Slot Cover ..................................................................................................... 37
Figure 22. Tightening the Captive Screw on an AT-CV5PNL1 Blank Slot Cover ............................................................... 38
Figures