AT-x950-28XSQ Switch and VCStack Installation Guide
77
Unpacking the AT-PWR600 AC Power Supply
To unpack the AT-PWR600 Power Supply, perform the following
procedure:
1. Remove the power cord and any documents from the accessory
partition. Refer to Figure 43.
Figure 43. Removing the Power Cord and Documents from the AT-
PWR600 AC Power Supply
1. Remove the partition from the shipping box. Refer to Figure 44 on
Summary of Contents for AT-x950-28XSQ
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Page 80: ...Chapter 3 Beginning the Installation 80 ...
Page 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Page 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Page 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Page 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Page 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Page 180: ...Chapter 11 Troubleshooting 180 ...