
Chapter 3: Beginning the Installation
78
Figure 44. Removing the Partition from the AT-PWR600 AC Power Supply
Shipping Box
2. Lift the power supply from the shipping box and place it on a level,
secure table. Refer to Figure 45 on page 79.
Warning
The power supply is heavy. Ask for assistance lifting the device out
of the shipping box. You might injure yourself or damage the device
if you lift it without assistance.
Summary of Contents for AT-x950-28XSQ
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Page 80: ...Chapter 3 Beginning the Installation 80 ...
Page 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Page 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Page 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Page 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Page 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Page 180: ...Chapter 11 Troubleshooting 180 ...