Chapter 7: Installing the Switch on a Wall
112
Installing the Switch on the Plywood Base
This procedure assumes that the plywood base for the switch is already
installed on the wall. Please review “Reviewing Safety Precautions” on
page 64 and “Choosing a Site for the Chassis” on page 70 before
performing this procedure. Allied Telesis recommends a minimum of three
people for this procedure.
Warning
The device is heavy. Always ask for assistance before moving or
lifting it to avoid injuring yourself or damaging the equipment.
Warning
The device should be installed on the wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment may result if it is not properly fastened to the wall.
E105
Allied Telesis recommends installing the power supplies and optional
XEM2 Line Card before installing the switch on a wall. For instructions,
refer to “Installing PWR600 AC Power Supplies” on page 82 and
“Installing an Optional XEM2 Ethernet Line Card” on page 86.
To install the switch on the plywood base, perform the following
procedure:
1. Place the switch in a table.
2. Install the four brackets with the sixteen screws that come with the
switch to the sides of the unit, as shown in Figure 70.
Figure 70. Installing the Brackets to the Switch for Wall Installation
Summary of Contents for AT-x950-28XSQ
Page 8: ...Contents 8 ...
Page 12: ...Tables 12 ...
Page 16: ...Preface 16 ...
Page 62: ...Chapter 2 Virtual Chassis Stacking 62 ...
Page 80: ...Chapter 3 Beginning the Installation 80 ...
Page 90: ...Chapter 4 Installing Power Supplies and Optional XEM2 Line Card 90 ...
Page 102: ...Chapter 6 Installing the Switch in an Equipment Rack 102 ...
Page 118: ...Chapter 7 Installing the Switch on a Wall 118 ...
Page 146: ...Chapter 8 Configuring Switches for Stacking 146 ...
Page 158: ...Chapter 9 Cabling the Networking Ports 158 ...
Page 180: ...Chapter 11 Troubleshooting 180 ...