Chapter 3: Beginning the Installation
52
Unpacking the Switch
Figure 14 lists items that come with the switch. If any item is missing or
damaged, contact your Allied Telesis sales representative for assistance.
Figure 14. Components of the Switch
Also included are four rubber feet and plastic push rivets; eight M3 bracket
screws; and four #8 x 1.5-inch wood screws with plastic anchors.
Note
You should retain the original packaging material in the event you
need to return the unit to Allied Telesis.
After checking the contents of the shipping containers, go to Chapter 4,
“Mounting the Switch” on page 53.
Two wall mounting brackets
One 2 m (6.6 ft) local management cable with
RJ-45 (8P8C) and DB-9 (D-sub 9-pin)
connectors
Two rack mounting brackets
(pre-installed on the switch)
Summary of Contents for AT-IE510-28GSX-80
Page 6: ...6...
Page 12: ...Tables 12...
Page 16: ...Preface 16...
Page 44: ...Chapter 2 Virtual Chassis Stacking 44...
Page 60: ...Chapter 4 Mounting the Switch 60...
Page 72: ...Chapter 5 Wiring the DC Connectors 72...
Page 78: ...Chapter 6 Installing SFP and SFP Transceivers 78...
Page 88: ...Chapter 7 Configuring the Switch for Stand alone Operations 88...
Page 116: ...Chapter 10 Powering On the Stack 116...
Page 120: ...Chapter 11 Troubleshooting 120...