Selecting a Site
When selecting a site for your bridging converter, observe the following
guidelines:
Select a site that is dust-free and moisture-free.
Be sure that the site that will allow you to easily access the fiber optic
and twisted pair cables and the power cord.
Use dedicated power circuits or power conditioners to supply reliable
power to the unit.
Reviewing Safety Guidelines
Please review the following safety guidelines before you begin to install
the AT-GS2002 Series bridging converters.
Laser
Class 1 laser device.
1
Laser
Do not stare into the laser beam.
2
Warning
To prevent electric shock, do not remove the cover. No user-
serviceable parts inside. This unit contains hazardous voltages and
should only be opened by a trained and qualified technician. To
avoid the possibility of electric shock, disconnect electric power to
the product before connecting or disconnecting the LAN cables.
3
Warning
Do not work on equipment or cables during periods of lightning
activity.
4
Warning
Power cord is used as a disconnection device. To de-energize equipment,
disconnect the power cord.
5
Summary of Contents for AT-GS2002 Series
Page 1: ...AT GS2002 AT GS2002 SP Gigabit Bridging Converters Installation Guide PN 613 50648 00 Rev A...
Page 8: ......
Page 32: ......
Page 58: ......
Page 64: ......
Page 91: ...AT GS2002 Series Installation Guide 91 1 1 2 3 LAN 4 5 6 I 7 8 9 40 C...
Page 93: ...AT GS2002 Series Installation Guide 93 20 21 22 23 24 25 26 UL 600 90 C 14 AWG 27 28 29...
Page 95: ...AT GS2002 Series Installation Guide 95 41 42 TEL PSTN 43 26 AWG...
Page 96: ......