
51
Chapter 4
Installing the Switch in an Equipment
Rack
This chapter contains the instructions for installing the switch in a standard
19-inch equipment rack. The procedures in this chapter are listed here:
“Beginning the Installation” on page 52
“Removing the Bumper Feet” on page 54
Summary of Contents for AlliedWare Plus AT-GS980M/52
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 46: ...Chapter 2 Beginning the Installation 46...
Page 50: ...Chapter 3 Installing the Switch on a Table or Desktop 50...
Page 53: ...GS980M Series Installation Guide 53 Figure 19 GS980M Switch Orientations in an Equipment Rack...
Page 82: ...Chapter 6 Cabling the Networking Ports and Powering On the Switch 82...
Page 86: ...Chapter 7 Troubleshooting 86...