Chapter 4: Installing the Switch in an Equipment Rack
52
Beginning the Installation
This chapter contains the procedure for installing the switch in a standard
19-inch equipment rack, with the brackets included with the unit.
Required Items
The following items are required to install the switch in an equipment rack:
Two equipment rack brackets (included with the switch)
Eight M4x6mm bracket screws (included with the switch)
Cross-head screwdriver (not provided)
Four standard equipment rack screws (not provided)
Switch
Orientations in
the Equipment
Rack
The switch has two sets of four screw holes on the left and right sides, for
attaching the brackets. Refer to Figure 18.
Figure 18. Bracket Holes on the Switch
You can use the sets of holes on the switch to install the switch in the
equipment rack in different orientations. You can install it with the front
panel flush with, extending in front of, or recessed behind the front of the
equipment rack. Refer to Figure 19 on page 53.
Bracket Holes
Summary of Contents for AlliedWare Plus AT-GS980M/52
Page 8: ...Figures 8...
Page 10: ...Tables 10...
Page 14: ...Preface 14...
Page 46: ...Chapter 2 Beginning the Installation 46...
Page 50: ...Chapter 3 Installing the Switch on a Table or Desktop 50...
Page 53: ...GS980M Series Installation Guide 53 Figure 19 GS980M Switch Orientations in an Equipment Rack...
Page 82: ...Chapter 6 Cabling the Networking Ports and Powering On the Switch 82...
Page 86: ...Chapter 7 Troubleshooting 86...