x610 Series Layer 3 Gigabit Ethernet Switches Installation Guide
93
2. Remove the transceiver from its shipping container and store the
packaging material in a safe location.
3. Position the transceiver with the label facing up if installing in a top slot
and with the label facing down if installing in a bottom slot.
4. Slide the transceiver into the slot until it clicks into place, as shown in
Figure 53.
Figure 53. Installing a Transceiver
5. Repeat this procedure to install additional SFP or SFP+ transceivers or
go to “Cabling the 10/100/1000Base-T and Fiber Optic Ports” on
page 94.
For SFP optical and cabling specifications, consult the documentation
shipped with the module.
22
S
FP
2
3
21
24
15
17
19
21R
16
1
8
20
22R
24R
2
3
R
1000
/
100
SD
STATUS
FAULT
MASTER
RPS
PWR
PRES
MSTR
L/A
L/A
CLASS 1
LASER PR
ODUCT
1
2
STACK
BU
S
Y
READ
Y
FAULT
CON
S
OLE
2082
Summary of Contents for 48Ts/X
Page 8: ...Contents 8...
Page 12: ...Tables 12...